PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Started laying out block at Stair -3 Facing North.jpg Installing Elev. 1,2,3 guide rails at the 4th floor Facing South.jpg Installing Emergency Night lighting split wire at the 3rd floor Facing East.jpg Installing exterior framing at the 4th floor Facing North.jpg Installing sprinkler branches at the 4th floor Facing West.jpg Installing Emergency Night lighting split wire at the 3rd floor Facing East (2).jpg
Previous pageNext page Installing sprinkler branches at the 4th floor Facing West
Installing sprinkler branches at the 4th floor Facing West